Monday, 15 March 2010

Call Sheet #1 by Alexander Martin

Call Sheet / Daily Schedule

Title: Corridor Scene

Shooting Date: 18th March 2010


Crew Details


Producer: Alexander Martin

Director: Alexander Martin





















Camera: Ian Uttley















Sound: James Allen




















Additional Crew: None


Location

Barnsley 6th Form College
Honeywell Site
Arts & Design Building
Media Bloc

Contacts

Alexander Martin: Actor / Director / Producer / Student

Ian Uttley: Camera / Equipment / Student

James Allen: Actor / Cataloguer / Student

Simon: Adviser / Media Tutor

Barnsley College: Shooting Location / Equipment Storage /

Schedule

Time Start: 14:00 pm

Details:

1. Shooting begins at 14:00pm despite the fact college finishes at 12:30.

2. Quick inspection of the shooting area to check for any obstructions or safety hazards.

3. Establish points to place the camera so as to maximise the space but also to get enough shots to build a decent running scene while having some spare encase of emergency reductions or extensions to how the film has to be.

4. Begin rehearsal of the whole corridor running scene at 14:20 and if it goes smoothly will have a short break at 14:40 to rehearse script and encourage any last minute ideas on how to film.

5. Begin filming and each section of the running hall scene will be filmed twice as a precaution at 14:40.

6. Short 10 minute break and during this time scripts will be re-read and any last minute idea put forward.

7. Filming begins for Mike and Coach meeting in the corridor and is again done twice and sometimes 3 times as a precaution against actors laughing during filming.

8. Filming will be very quick since it was a short dialogue scene, camera will now be positioned behind the actors and shot again and then shot again but from the side angle so as to see which angle works best and sue the one selected in the editing process.

Wrap Time: 16:00 no later

Additional Contacts / Equipment: Standard digital camera
Tripod